Skip to content

Process

Our 3D printing process

Our 3D printing process runs in five steps from file to dispatch, with inspection before release. Each step leaves a record, so every part can be traced back to its build.

Steps
5
Fastest lead time
12 hours
Inspected before release
100%
Components produced
312,467

From receipt to release

  1. 01

    Receipt

    Files and drawings are checked for manufacturability before quoting.

    Record: DFM notes
  2. 02

    Build

    Process parameters and material lot are recorded per part.

    Record: build log, material lot
  3. 03

    Inspection

    Dimensional and visual checks against the drawing and CAD.

    Record: inspection result
  4. 04

    Documentation

    Traceability records are compiled for the first part of every new design.

    Record: first-part records
  5. 05

    Release

    The traceability pack is compiled and the part is signed off for dispatch.

    Record: release sign-off

An engineer reviews every file before it is printed

Features that need a different tolerance or orientation are flagged before the build.

Changes cost least at this stage.

Engineer reviewing a part
Engineer review before build

Tolerance and lead time by process

FDM
±0.5% (min ±0.3 mm) · from 1 calendar dayParts up to 1000 mm
SLA
±0.5% (min ±0.1 mm) · from 1 calendar dayThe lowest minimum we quote
SLS
±0.3% (min ±0.3 mm) · from 2 calendar daysSupportless PA12 nylon
Tighter than ±0.1 mm
Print, then ream or machine the featureFlag critical dimensions on the drawing; we check them before dispatch

At a glance

312,467components produced
21countries delivered to
4UK sites

Related guides

Start an order

Upload your CAD. We confirm manufacturability, tolerance and documentation before we build. Uploads are secure and confidential.

Companies that use HenleyPrint3D

How instant 3D printing quotes work