Quality
3D print quality control and inspection
Every part is inspected against the drawing before dispatch, and the records stay with the order. We are working towards ISO 9001.

Inspection flow
- 1
Receipt
Files and drawings checked for manufacturability.
- 2
Build
Process parameters and material lot recorded per part.
- 3
Inspect
Dimensional and visual checks against drawing and CAD.
- 4
Document
First-part records compiled for every new design.
- 5
Release
Traceability pack compiled, part signed off.
Inspection checks and methods
Every-build checks are listed first. The rest are by arrangement, confirmed at quote.
| Check | What it shows | Method | Availability |
|---|---|---|---|
| Visual inspection | Surface finish, layer quality, defects | Against the drawing and CAD | Every build |
| Dimensional check | Critical dimensions against the drawing | Typical FDM tolerance ±0.5% | Every build |
| Material and lot record | Which material lot made which part | Recorded per part at build | Every build |
| First-part records | Documented first article for a new design | Compiled before the run continues | New designs |
| CMM measurement | Critical dimensions to tighter limits | Coordinate measuring machine | By arrangement |
| 3D scanning | Surface deviation from CAD | Optical scan compared to the model | By arrangement |
| CT scanning | Internal geometry and porosity | Non-destructive scan | On request, confirmed at quote |
| Mechanical test coupons | Strength of the material as printed | Coupons built with the job and tested | On request, confirmed at quote |
Tolerance depends on process, material and geometry. Tighter limits are confirmed against your drawing at quote.
Related guides
Documentation with your parts
Tell us what records you need when you upload. We confirm tolerance and documentation before we build.