Complex FDM parts, batch-produced to tight tolerances

A batch of complex FDM parts for an industrial customer, held to tight tolerances, with an inspection record for each part.

Get an instant quote (opens in a new tab)

Process
FDM
Production
Batch
Inspection
Per part
Outcome
Every part met specification
Batch of grey complex FDM parts inspected against the drawing

Batch controls

No.ControlWhat we did
01CalibrationMachine calibration kept stable across the run
02OrientationSame orientation and plate layout for every build
03ParametersControlled, not adjusted per part
04InspectionEvery part against the drawing, dimensional and visual
05RecordsInspection record per part
06OutcomeEvery part met specification

Challenge

  • Tight tolerances on complex geometry across the whole batch.
  • The same quality from first part to last.
  • An inspection record for every part.

Approach

  • Control tolerance. Complex geometry was made within the required tolerances.
  • Lock the parameters. Controlled parameters gave uniform results across the batch.
  • Inspect each part. Dimensional and visual checks on every part.

Result

  • Every part met specification.
  • Consistent quality across the run.

Why this process and material

Batch tolerance is set by the process

It depends on stable machine calibration, material condition and build position, so we control all three.

Fixed orientation

Orientation changes dimensional behaviour. The same orientation and plate layout for every build removes one source of variation.

Per-part inspection

Checking every part against the drawing turns repeatability into a record.

Summary of the engineering approach

Tolerance at batch scale is a process problem, so it was controlled at source: stable machine calibration, the same orientation and plate layout for every build, and parameters that were controlled rather than adjusted per part. Every part was then checked against the drawing, dimensionally and visually, which turns repeatability into an inspection record for each one.

Questions about this project

How were tight tolerances held across the batch?

Machine calibration was kept stable, orientation and plate layout were the same for every build, and parameters were controlled, not adjusted per part.

How was each part checked?

Every part was inspected against the drawing, dimensionally and visually, with an inspection record per part.

What was the outcome?

Every part met specification, with consistent quality across the run.

Suggested next steps

Recommendations for taking the part further. None of this is completed work.

  • A standing inspection report, so a reorder can be compared with the first run.
  • Review the features that use most of the tolerance budget and simplify them where possible.
  • Larger batches on a repeat-order schedule.